Ermes Deluxe Ergo Mesh Office Chair | Executive S Curve Adjustable Gaming Computer Chair
DESCRIPTION
Introducing the Oikiture office chair, the ideal choice for comfortable, ergonomic seating in your home office! Featuring top-grade materials and a modern design, this chair offers adjustable seat height and tilt, a high backrest for spinal support, built-in lumbar support, and adjustable armrests. You'll stay mobile with the smooth swivel base and sturdy wheels, and you can achieve the perfect position with the lock-in mode for the headrest! Enjoy maximum comfort, style, and convenience with our Oikiture office chair.
FEATURES
S-Curved mesh backrest
Fabric seat upholstery
Highly breathable
Angle and height adjustable headrest
Adjustable seat height
Removable headrest (By unscrewing it off the chair)
Lock-in mode for headrest height and angle
Retractable armrests to fit under your desk
Generous and high resillence foam paddings
Flexible tilt adjustment
Wide and tall backrest
Premium universal wheels
Smooth 360-degree swivel
Eliminates back and shoulder pressure
Ideal for gamer and business uses
ITEM SPECIFICATIONS
Brand: Oikiture
Frame Material: Nylon
Backrest Material: Mesh
Seat Material: fabric
Seat Fill Material: Foam
Maximum weight capacity: 130kg
Colour: White&Black, Black, White
Overall Size: 60*60*(111-124)cm
Seat height adjustment: 39cm-48cm
Assembly required: Yes
Number of packages: 1
Warranty: 3 years
PACKAGE CONTENTS
Oikiture Office Chair x 1
Assembly Instructions x 1